Utility clearance
Identify existing-service constraints early enough to support safer route planning, design coordination and delivery.
Design / 01
Heat network design and site-survey support for routes, utility clearance, PAS 128/GPR, topographic surveys and nationwide CCTV drainage surveys, energy centres, plantrooms and buildability decisions.
Design brief
Heat network design risk rarely sits in one drawing. It sits between the route, plantroom, energy-centre strategy, controls, metering, HIUs, commercial scope and the evidence a delivery team will need later.
DHS helps clients test those links while the project can still move, so the design basis is buildable, commercially legible and easier to carry into handover.
Utility & site surveys
DHS can provide the supporting site intelligence needed to establish and validate the design basis, coordinate the route and reduce uncertainty before delivery.
Identify existing-service constraints early enough to support safer route planning, design coordination and delivery.
Provide underground utility survey evidence, including ground-penetrating radar, to inform design and civils coordination.
Capture site levels, features and physical constraints for route, plantroom and wider design coordination.
Provide drainage survey evidence nationwide to support informed design, coordination and delivery decisions.
Design decisions that matter
These are the areas DHS would test first when reviewing a district heating or heat network design.
Test route length, civils interfaces, access, expansion points and maintainability before the alignment becomes difficult to change.
Check heat-source assumptions, plant selection, redundancy, space planning and operating temperatures against the intended network outcome.
Coordinate equipment, pipework, access zones, lifting routes, valves, control panels and metering so the room can be installed and maintained.
Review dwelling interface assumptions, flow rates, controls logic and maintenance access before apartment-level decisions become a performance constraint.
Make control philosophy, sequencing, weather compensation, pump control and metering logic visible early enough to influence design.
Plan heat meters, data visibility, landlord supplies and consumer-facing requirements so performance evidence is designed in rather than added late.
Test temperature strategy against heat-source efficiency, pipe losses, HIU performance, commissioning and future optimisation.
Challenge drawings against site constraints, phasing, buried services, access, procurement packages and handover evidence.
Design intentProcurementDeliveryOperation
Evidence board
For design support to be useful, it has to become evidence: annotated assumptions, route notes, plantroom observations, coordination actions, controls and metering logic, HIU considerations and handover implications.
Design hold points
Each handover narrows the room for correction. DHS focuses on the points where a design decision still has leverage.
Stress-test the route, heat-source strategy, plantroom constraints and performance assumptions while the project can still move.
Turn design intent into clear packages, responsibilities, exclusions, BoQ logic and buildability notes suppliers can price.
Check access, sequencing, interfaces, materials lead-in, testing routes and commissioning evidence before programme pressure takes over.
Protect controls, metering, HIU, O&M and commissioning evidence so performance does not become an operational surprise.
Project-stage fit
Use DHS when the project needs design evidence to stay coherent across feasibility, design development, procurement and delivery readiness.
Feasibility
Heat-source, load, route and spatial assumptions can make the preferred option look simpler than it is.
Option review, route challenge and early technical-commercial notes.Design development
Plantroom, buried pipework, controls, HIUs, metering and access decisions can drift into separate workstreams.
Coordinated survey evidence, design basis, layout review and buildability actions.Procurement
Ambiguous scope, missing interfaces and weak evidence make tender returns harder to compare and defend.
Tender-ready design evidence, scope clarifications and package notes.Delivery readiness
Site changes can weaken design intent unless commissioning and handover evidence are visible early.
Delivery review notes and evidence requirements for installation teams.Practical outputs
The aim is not design commentary for its own sake. The aim is evidence that can be used by clients, QS teams, tendering contractors, delivery teams and operators.
Technical FAQ
Practical questions clients ask before appointing specialist heat-network design support.
The earlier the better, especially before route, plantroom, heat-source, operating-temperature and procurement decisions harden. DHS can also review live designs where the client needs a second technical-commercial view before tender or delivery.
Yes. DHS can provide utility clearance, PAS 128 underground utility surveys including GPR, topographic surveys and CCTV drainage surveys nationwide, helping project teams establish site constraints before route, coordination and delivery decisions harden.
Heat networks connect energy-centre decisions, buried infrastructure, commercial scope, HIUs, controls, metering, commissioning and resident outcomes. A technically sound drawing can still create risk if those interfaces are not joined up.
Yes. DHS can review plantroom layouts, energy-centre strategy, access, maintainability, controls, metering and buildability so the design basis is easier to procure, install, commission and operate.
Yes. DHS looks at how HIUs, metering and controls affect operating temperatures, commissioning evidence, resident experience and long-term performance, not just whether the components appear on a drawing.
DHS helps turn design intent into clearer packages, scope boundaries, buildability notes and evidence that tendering teams can price and delivery teams can carry forward.
Connected services
Design
Heat network design and site-survey support for routes, utility clearance, PAS 128/GPR, topographic surveys and nationwide CCTV drainage surveys, energy centres, plantrooms and buildability decisions.
Buildable designs backed by site intelligence 02Commercial
QS-led commercial discipline for heat network projects, from early cost planning and BoQ development through tender control, procurement support and contract-stage risk management.
Cost certainty and commercial rigour 03Delivery
Supply, installation and commissioning support that protects design intent through procurement, energy-centre and network works, testing and handover.
On-programme, first-time performance 04Compliance
CDM, Principal Designer and client-side assurance support for heat network projects facing CP1, HNTAS, Ofgem and stronger technical-evidence expectations.
Embedded regulatory compliance from day one 05Performance
Lifecycle support for heat networks where performance depends on commissioning evidence, controls, HIUs, metering, monitoring, operator readiness and resident outcomes.
Long-term performance built inDesign and survey support
If a scheme needs clearer route evidence before design, procurement or delivery, DHS can provide the design review and supporting utility or site surveys needed to move the next decision forward.